Practical Location Build
       
     
Practical Location
       
     
Partial Build
       
     
Elevator Wall Build
       
     
Almost done
       
     
Practical Location Build
       
     
Practical Location Build

Customized paneling complete and doors open and close using control panel.

Practical Location
       
     
Practical Location

The elevators will be seamlessly installed in the lobby area where the man is standing.

Partial Build
       
     
Partial Build

The left side of the elevator wall nearing completion.

Elevator Wall Build
       
     
Elevator Wall Build

Both right and left side are now installed.

Almost done
       
     
Almost done

Just a few more finishing touches and it is ready for “Action!”